Extension of Water Transmission Main to Kishapu town via Williamson Diamond Limited (WDL), Maganzo and Kolandoto.

This project will be financed jointly by KASHWASA, WDL and Water Sector Development Programme (WSDP), whereby a 65km transmission pipeline will be extended from Old Shinyanga main pipeline to Mhunze town in Kishapu District via Maganzo, Nkolandoto and WDL as well as all villages along the anticipated route of the pipeline. The project will be implemented jointly by in-house staffs from KASHWASA, Williamson Diamond Limited (WDL) and Kishapu District Council. Currently the Authority is at the final stage of signing contract for supplying pipes and fittings with the proposed Suppliers.

Extension of Water Transmission networks from Mabale reservoir to Nyang`homango Village

This project will be implemented by KASHWASA, under WSDP, whereby the transmission pipeline will be extended from Mabale reservoir to Nyang`homango village.

Extension of Water Transmission Network to New Villages

This project wll be implemented under the Water Sector Development Programme (WSDP), whereby 100 villages have been earmarked to be connected to the Lake Victoria Water Supply Scheme. The detailed topographical survey was carried out in 3 more villages located in Msalala District,making a total of 34 surveyed villages in both Shinyanga and Msalala Districts. The detailed design and preparation of cost estimates and tender documents for 14 villages was carried out. Moreover, the

Authority signed contracts for construction of water transmission and distribution networks in 6 villages located in Shinyanga Rural District. Detailed design and preparation of cost estimates and tender documents for construction works in the remaining villages are underway.